Start Up Chemical Pool Kit Instructions: Step 1 - Remove Pool Cover Step 2 - Recconect any plumbing, filter, pump, Etc. Step 3 - Fill Your Pool: If your pool water level was lowered in the winter fill the pool to normal level. Step 4 - Begin to run pump & filter system Step 5 - Thoroughly clean & vacuum your entire pool. Step 6 - Apply Chemicals from our kit (follow below method). Our Start Up Chemical Kits consist of 3 parts: ----------------------------------------------- A- Chlorine Based, or Non-Chlorine Pool Shock B- Algaecide For control of Algae growth C- Fast acting Clarifier to help eliminate cloudy water ----------------------------------------------- Amount Of Chemicals per kit: 7,500 GALLON KIT INCLUDES: •1 Quart Algaecide •1 Clarifier •1 lb. Shock (Chlorine or Non-Chlorine based depending on kit ordered) 15,000 GALLON KIT: •1 Quart Algaecide •1 Clarifier •2 lb. Shock (Chlorine or Non-Chlorine based depending on kit ordered) 30,000 GALLON KIT: •2 Quarts Algaecide •1 Quart Clarifier •3 lb. Shock (Chlorine or Non-Chlorine based depending on kit ordered) 40,000 GALLON KIT: •2 Quart Algaecide •2 Quarts Clarifier •4 lb. Shock (Chlorine or Non-Chlorine based depending on kit ordered) --------------------------------------------------- Chemical Application: 1st) Thoroughly dissolve shock in a bucket with warm water (see precautions on packet). Once thoroughly dissolved, pour the shock solution around the pool. Run the pool filter for 1 hour to distribute shock in to the pool. 2nd) After 1 hour apply Algaecide per instructions on the bottle. Run Filter to mix Algaecide in the pool (approx 1/2 hour). 3rd) After applying Algaecide, now apply the Clarifier. Follow instructions on the bottle for your pool size. Run Filter to mix in the pool (approx 1/2 hour). ***DO NOT MIX CHEMICALS TOGETHER*** ------------------------------------------------------- Step 7 - Continue to run filter & pump for 48 hours. Step 8 - Enjoy the pool season!